JaymezMerfy1002 JaymezMerfy1002
  • 01-10-2018
  • Computers and Technology
contestada

Which term describes the complexity of a document

Respuesta :

narstarolor
narstarolor narstarolor
  • 06-11-2020

Answer:

Work breakdown structure (WbS)

Explanation:

A work-breakdown structure in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections, and also defines its complexity.

Please let me know if this helped

Answer Link

Otras preguntas

Bryson buys a bag of 64 plastic miniature dinosaurs . could he distribute them equally into six storage containers and not have any left over?explain .
what is the limit of cos(infinity)
what is a "summary number model"?
An atom of an element has 10 protons. What is also true of that atom? A. It has 10 electrons. B. It has 10 isotopes. C. It has 10 neutrons. D. It has 10 ions.
Identify the type of chemical reaction. H2CO3 H2O + CO2 decomposition exchange reversible synthesis
list the layers of the sun in order from the innermost to the outermost.
what do b times h mean
Which class of organisms gather their energy directly from the sun? a. autotrophs b. carnivores c. herbivores d. detritivores
Estimate the sum or difference? 6/10 + 7/12 Not sure how to do?
Moving through trophic levels _______. a. energy decreases b. entropy increases c. biomass decreases d. all of the above