batshonnicole
batshonnicole batshonnicole
  • 02-01-2019
  • Mathematics
contestada

Six people paint the fence and 15 hours how long would it take five workers to do the same job

Respuesta :

somaiasult2006
somaiasult2006 somaiasult2006
  • 02-01-2019
it will take 12.5 hrs for five workers to do the same job.


steps:

15 × 5 = 75

75 ÷ 6 = 12.5
Answer Link

Otras preguntas

Which type of account will typically have the highest interest rate? a everfi?
_______ are regulatory agencies, such as the sec (securities and exchange commission), that establish ground rules under which organizations may operate
Peter does not have a lot of exposure to sunlight because of his job. Which food can he get vitamin D from? a. carrots b. citrus fruit c. root vegetables d. mil
What were the immediate causes of the english civil war what were some important results?
Please select the word from the list that best fits the definition In the mantle, heat is transferred as soft rock flows slowly in cycles known as ______ curre
What did da gama have that indian merchants were happy to take?
Kristen owns a bakery called Kristen’s cakes and such and is considering lowering the price of her cakes Kristen pulls her customers and determines that she can
David loved to spend time with his grandparents, but he loathed the _____ drive through three hundred miles of mid
why are school buses yellow, nd why do they move
devise a plan for simplifying th fourth root of a number that is not a perfect fourth power.