An over-target baseline (OTB) is a comprehensive rebaselining effort that is best categorized as an internal replanning effort.

A. True
B. False

Respuesta :

codiepienagoya codiepienagoya
  • 06-01-2020

Answer:

The answer is "option B".

Explanation:

An OTB stands for an over-target baseline, it is a new management benchmark when an original target can't have coincided and new goals for management purposes are required.

  • It is also known as a reference to the foundation for calculating or constructing.
  • It is an understanding between the client and the contractor that the cost base, which is not part of the original contract budget, should include an extra budget

Answer Link

Otras preguntas

John was given a choice of loans of $8,000 with the following characteristics: a) $1,200 in interest paid at the end of the period b) $1,200 in interest paid at
How far (in meters) above the earth's surface will the acceleration of gravity be 21.0 % of what it is on the surface?
Which was a first amendment right that was ruled by the warren court
When constructing a prependicular bisector why must the compass opening be greater than 1/2 the length of the segment ?
round to the nearest hundred 1,139
hi what three 33889+5555 times 84 divided by sixteen
true or false integers are a part of the natural numbers subset
What might be the problem with using intervals that are too long
Which two sets of ordered pairs represent a function ?
Find the perimeter And the area of a polygon shown below *in picture*