kimbrachantel2962 kimbrachantel2962
  • 03-03-2020
  • Computers and Technology
contestada

The transition from ____ is initiated by the Job Scheduler according to some predefined policy. At this point, the availability of enough main memory and any requested devices is checked.

Respuesta :

isaacoranseola
isaacoranseola isaacoranseola
  • 04-03-2020

Answer: Hold to ready

Explanation:

This is when the process is waiting to be assigned to a processor. And this is carried out by the short term scheduler, so it can run. This state is immediately after the new state for the process.

Answer Link

Otras preguntas

Let E and F be independent events in a sample space S with Pr[E] = 0.4 and Pr[F] = 0.2. Find Pr[EUF] A.0.60 B.0.52 C.0.40 D.0.32 E.0.08
why are quebec and ontario known as canadas economic heart
Name the two lines and the transversal that form each pair of angles
Why is man a special creature? What two worlds does he share in?
Is Glass a good conductor of heat? is Metal a good conductor of heat? is wood a good conductor of heat
Lily and julian start with the same number. Lily works out half the number and Julian works out 3 quarters The sum of their answers in 275 What was the startin
If you know two points on a line, how can you find the rate of change of the variables being graphed?
Ho long does it take for the Moon to show all its faces? Thank you❤
step by step how to solve 3y + 5.2 = 2 - 5y
why do you use cubic units and not square units to find the volume of solid figures?