lenacanate lenacanate
  • 03-10-2020
  • Mathematics
contestada

a crew of loggers cleared 1/2 acres of lumber in 4 days. How long will it take the same crew to clear 2 3/4 acres of lumber?

Respuesta :

firasadasjunk firasadasjunk
  • 03-10-2020

Answer:

88 days

Step-by-step explanation:

Answer Link
Epicpatato445
Epicpatato445 Epicpatato445
  • 03-10-2020
It would take a total of 88 days
Answer Link

Otras preguntas

An antonym is a word that's
In which direction is each ocean from North America
Joseph is forming a three-dimensional figure using a net. The figure has six congruent square faces. What types of figure did he make?
describe how switching the desk lamp on and off shows that light waves transfer energy
Explain one way that ethnic groups in the US and Canada are similar in one way that they are different
Verify that 1 + cot2 x = csc2 x is an identity.
how can you tell if 78 is divisible by 2 3 OR 6
what two rivers join at sutters point
What percent of 45 is 72?
7. The Preamble of the Constitution of the United States clearly states that the source of governmental authority is which of the following? Local governments