shresthasamrachana06
shresthasamrachana06 shresthasamrachana06
  • 01-04-2021
  • Mathematics
contestada

12 workers can do a peice of work in 20 days. How many workers should be added to complete work in 16 days?​

Respuesta :

atchleyamirah69
atchleyamirah69 atchleyamirah69
  • 01-04-2021
3 workers

if 12 workers can do a piece of work in 20 days, then one person can do it in 240 days. 240/16 is 15. That is the number of workers that you need in total to it in 16 days. Since the question ask how many more workers,
15 - 12 = 3 more workers.
Answer Link

Otras preguntas

Balance the following chemical equation : C7H6O3 + C4H6O3 —> C9H8O4 + H2O
Question 3/5 John and Jane are both 22, and both weigh 140 pounds. At a party, they drink the same amount over the same period of time. Whose BAC will be higher
Apply the distributive property to factor out the greatest common factor.70−40p
3000*600+34343-43542313153/2 I will give the brainliest for the first one who answers​
What happens to monna and her son
If someone were able to squat 200 lbs one time and not be able to lift it anymore, this would demonstrate what? A. Muscular Strength B. Muscular Endurance C. M
if velocity is postive, which would most likely yield a negative acceleration
What are the factors of x2 - 4x - 5? Check all that apply. x-5 x-2 x-1 x + 2 x+5
What was Fredrick the Great's domestic policy? What were the 2 main features?
What was the homestead property protection provision of the Texas State Constitution of 1845?