alexslayer44
alexslayer44 alexslayer44
  • 01-12-2021
  • Mathematics
contestada

Jin schedules 496 hours for a project. He plans to work 8 hours each day. How many days will it take to complete the project?​

Respuesta :

penguinlife90 penguinlife90
  • 01-12-2021

Answer:

62 days

Step-by-step explanation:

496/8 = 62

Answer Link
clickykeyboardasmr
clickykeyboardasmr clickykeyboardasmr
  • 01-12-2021

496/8=62

Hope this helps!

Answer Link

Otras preguntas

The box and whisker plot displays a set of data obtained from a marketing survey. Drag each item to the appropriate position on the number line. Drag the extra
How to solve? Sara has $100. She gave 3/4 of the money to her sister. She gave 1/2 of the rest of the money to her friend. How much money does she have left aft
If a pregnant woman drinks 2-5 alcoholic drinks per day, what effects does this have on the developing baby?
How will the amount of thermal energy required to change each substance from a liquid to a gas differ? A) Water and mercury will require the same amount of ener
The Run is the ___ Change between two points on a line
please i really need this promise to give brainlist plzzzzzzzzzWill give brainlist!!!!!! In Figure 20-1, which of the following is characteristic of the air mas
after the coelom developed, what process allowed for the evolution of the many types of protostomes?
The president can call a ________ session of congress, at which time both the house and senate meet together.
Need help ASAP!! (Geometry) *Attachments*
After jogging 3 miles bobby checked his heart rate he counted 30 beats and 15 seconds what would his heart rate be for one minute