nikolaungurian nikolaungurian
  • 03-03-2022
  • Mathematics
contestada


It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

Respuesta :

Esther
Esther Esther
  • 03-03-2022

Answer:

20 days

Step-by-step explanation:

It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

12 * 5 = 60

60/3 = 20

It will take 3 men 20 days to do the same job

Answer Link

Otras preguntas

Why is thanks giving always observed on a thursday?
160% of what number is 70
I want to do my homework math
Quick picture to show 3x2.7
In what way does the view of imperialism in Source B contrast with that in Source D?
Which fraction below represents 30% in simplest form.?
What allows the asthenosphere to be able to move slowly? a. the heat of earth's interior at that depth b. the friction of the plates moving above it c. the m
$240 plus 6% sale tax?
What is the equation in point slope form of the line that passes through the point (2, 6) and has a slope of 5? y−2=5(x−6) y+2=5(x+6) y−6=5(x−2) y+6=5(x+2)
7242 rounded to the nearest tenths