josephmarvens2787 josephmarvens2787
  • 04-03-2022
  • Biology
contestada

When was the keystone pipeline scheduled to be completed.

Respuesta :

Аноним Аноним
  • 04-03-2022

Answer:

2021 - 2022, but the truth is it never got completed.

Answer Link

Otras preguntas

Triangle LMN with vertices L(-9,-1) M(-3,-4) and N(-5,-8) Part A: 270 degrees counterclockwise rotation about the origin Part B: translated along the (x,y)-(x+7
gap region between the diver's skin and her wetsuit, forming a water layer about 0.5 mm thick. Assume that the total surface area of the wetsuit covering the d
Negative Exponents If Xand a are counting numbers, is *** less than or greater than 1?
Plssssssssssss helppppppp
Maria's book is longer than Brandon's. The difference in the two book lengths is 56 pages. The total amount of pages in both books together is 348. Find the len
What is an approach mentioned in the text to prevent Chinese consumers from creatively copying foreign intellectual property?
Which of the following statements is true about education and lifetime earnings?
In your opinion, what is meant by the "Giving Tree" in our community. Think of what a tree is composed of. Brainliest
: write 10 sentences with adverbs with he and she.
Classify the polynomial: x3 + 2x2 + x A binomial B monomial trinomial perfect square