A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

solve the following equation by completing the square. 3x^2-3x-5=13
Write a word phrase that can be represented by m + 25. A - the difference of 25 and m B - 25 less than a number m C - 25 more than a number m D - the quotient o
There is a 20% chance of thunderstorms tomorrow. Describe the likelihood of the event. Please help asap! I need a clear answer for what to put in the answer box
two sign of mental/emotional and socal stress
Solve for the following indicated variable and show all work. V= 2(ab + bc + ca) Solve for a​
PLEASE ANSWER ASAP *picture attached*
help to convert a------------unit,move the decimal point to the-----------or------------
how big is the planet earth​
Can someone tell me if this is Irrational or not.​
Ana presenta un examen. la cafetería el estadio la biblioteca el salón de clase el auditorio