agyasmithmartersax agyasmithmartersax
  • 01-05-2017
  • Mathematics
contestada

An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

Does an owl have a backbone?
Does an owl have a backbone?
Forget the motor When im on the boat Think of the best time To buy a new coat What am I......?
Factor the expression. If the expression cannot be factored, say so.
Factor the expression. If the expression cannot be factored, say so.
Factor the expression. If the expression cannot be factored, say so.
josh wanted to buy a bicycle but didn't have enough money. After josh told his troubles to sam slick, sam said,"I can fix that. see that fence? each time you ju
Factor the expression. If the expression cannot be factored, say so.
Factor the expression. If the expression cannot be factored, say so.
The ______ was established in 1943 to assist in the transition from a peacetime to a wartime economy ?