medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

At the market, almonds cost $0.51 per ounce. How much does a bag of almonds cost if it weighs 1.6 ounces?
What happens to earnings in a cooperative?
d Bula drives to work and back every day. One way, the trip is fifty miles. How many miles does she drive in five days?
What happens to earnings in a cooperative?
At the market, almonds cost $0.51 per ounce. How much does a bag of almonds cost if it weighs 1.6 ounces?
Can someone help me out with this question fast!?!?!
Differentiate between the points of parity to the points of difference based on the given scenarios. Points of parity I Points of difference A national college
26. Which of the following is an equation for the line that is perpendicular to the line y = 2x - 9 and passes through the point (-4,5)? A. y = 2x+7 B. y = -1/
What is the formula of Sodium Sulfide? A) Na3S₂ B) NaS₂ C) Na₂S D) Nas
Determine the perimeter of the right triangle shown. Round your final answer to the nearest whole number, if necessary. right triangle with vertices at negative